DPWH-8 Ramps Up Construction of Tacloban’s ‘Grand Canal’ Project

Updated 3 Days Ago
ByHOMESPH NEWS
12 views

Summary

The Department of Public Works and Highways in Eastern Visayas (DPWH-8) is accelerating the PHP4.4 billion Tacloban-Palo Diversion Road, or "Grand Canal" project, despite receiving no new 2026 budget allocation. Using existing 2024 and 2025 funds, 756 meters are complete and 1.25 kilometers are underway as of October 2026, with PHP2.1 billion proposed for 2027 to finish the 3.23-kilometer stretch. Spanning from San Jose in Tacloban to Campetic in Palo, this four-lane highway features a massive central drainage system to mitigate severe flooding in low-lying villages, alongside modern road amenities designed to transform flood-prone areas into thriving commercial zones.

Infrastructure

Tacloban City

Photo courtesy of DPWH-8
Photo courtesy of DPWH-8

TACLOBAN CITY, LEYTE — The Department of Public Works and Highways in Eastern Visayas (DPWH-8) is accelerating the construction of the PHP4.4 billion Tacloban-Palo Diversion Road, locally known as the "Grand Canal" project. Despite receiving no new funding allocation under the agency's 2026 budget, work continues steadily using existing 2024 and 2025 regular budget appropriations. As of late October 2026, DPWH-8 reported that 756 meters of the road and drainage network have been completed through earlier allocations from 2019, 2023, and 2024, while another 1.25 kilometers are actively underway. Out of the total project cost, at least PHP2.33 billion was released through 2025, prompting the regional office to propose the remaining PHP2.1 billion for inclusion in the 2027 national budget to finish the 3.23-kilometer stretch.

Designed as a vital infrastructure upgrade, the four-lane highway spans roughly 3.2 kilometers, linking the San Jose district in Tacloban City to Campetic village in Palo, Leyte. A centerpiece of the initiative is a massive 16- to 22-meter-wide flood control and drainage system integrated directly along the center of the roadway to deter encroachment and prevent waterway blockages. This expanded drainage capacity is specifically engineered to alleviate chronic, severe flooding across low-lying communities in both municipalities. Key areas poised to benefit include Candahug, Pawing, and Campetic in Palo, alongside Caibaan, San Jose, Marasbaras, Manlurip, V&G Subdivision, and Imelda Village in Tacloban, where typhoon-induced floodwaters often linger for weeks before subsiding.

Beyond its primary role in flood mitigation and traffic decongestion, the diversion road is envisioned as a major catalyst for urban and economic revitalization across the region. The comprehensive development plan incorporates modern public amenities, including dedicated bike lanes, pedestrian sidewalks, service roads, solar-powered streetlights, and essential road safety devices. By resolving persistent drainage issues and improving inter-municipal connectivity, the infrastructure is projected to transform previously idle, flood-prone lands into thriving commercial zones. While acknowledging that budget approvals remain outside the agency's direct control, DPWH Eastern Visayas Regional Director Edgar Tabacon emphasized the agency's optimism for 2027 funding, noting that the project's full completion will deliver transformative, long-term benefits to local communities.

HOMESPH NEWS

Nov 18, 2026

HomesPH

Advertisement Unavailable