Behind Every Classroom Is a Power System
OZAMIZ CITY - Students may notice new chairs, computers, or classroom improvements more easily than electrical infrastructure, but schools depend on reliable power systems every day. On June 19, 2026, the DepEd Division of Ozamiz City issued an unnumbered memorandum directing schools to prioritize the rehabilitation of electrical service entrances. The same day's official records also listed a separate directive concerning the prioritization of electrical rewiring in Marcos-type school buildings. The two directives make this a distinct infrastructure story because they focus on the systems hidden behind walls, ceilings, and electrical panels. The documents do not establish that all Ozamiz schools require rewiring or that widespread electrical problems exist. Instead, they show that the Division has identified specific electrical infrastructure concerns that require attention.
Maintenance Work Can Be Just as Important as New Construction
School development is often associated with constructing new buildings, but maintaining existing facilities can be equally practical. The June directives place attention on rehabilitation and rewiring rather than simply adding new structures. This matters particularly for older school buildings, where electrical systems may require assessment or improvement as facilities accommodate modern equipment and changing classroom needs. The DepEd records also show other infrastructure-related actions in 2026, including a May directive to initiate the demolition of a one-storey, three-classroom Bagong Lipunan school building and a COPSTEA building that were identified as posing safety risks. Taken together, these records show that school-facility management in Ozamiz involves several different tasks—from addressing electrical systems to dealing with structures that require more substantial intervention.
A Quiet Upgrade That Supports Everyday Learning
Electrical work rarely produces the kind of visual change associated with a new school building, but its effects can reach many ordinary activities. Classrooms use lighting, computers, printers, projectors, charging equipment, ventilation, and other electrical devices that depend on functioning infrastructure. The June 19 directives therefore provide an interesting perspective on the less visible work behind school operations in Ozamiz. It would be premature to say that the planned rehabilitation has already improved classroom conditions because the available DepEd listing does not provide completion figures or results. What can be established is that electrical service entrances and rewiring in Marcos-type buildings were specifically identified for prioritization. For students and teachers, that makes this a story about the infrastructure beneath ordinary school routines—and how maintaining it can be part of keeping campuses functional.









